Diary
LOCKED · 2024-11-04

Susan River Solar Farm — site inspection

A site inspection at Susan River Solar Farm on 4 November 2024, covering field infrastructure, site access and substation areas.

View in the Gallery
Project details locked

Full site details and photos are available on request.

Request access
All diary posts